Difference between revisions of "Controls Meeting 25-Mar-2021"

From GlueXWiki
Jump to: navigation, search
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
Announcements
+
* Announcements
 
* Solenoid status  
 
* Solenoid status  
 
*: State code in PLC (Nick)
 
*: State code in PLC (Nick)
 
*: PXI issues (Brian)
 
*: PXI issues (Brian)
* GUIs for BCAL/COMCAL chiller controls(Nick,Hovanes)
+
* BCAL temperature PLC controls stability (Nick)
* Magnet power supply related temperature readouts  
+
* GUIs for BCAL chiller controls (Hovanes)
* FCAL HV controls modifications (Hovanes)  
+
*: [[media:bcal_chillers_plc.jpg | Snapshot of EPICS GUIs]]
 +
* Magnet power supply related temperature readouts (Scot)
 +
* FCAL HV controls modifications (Hovanes, Nick)  
 
* FCAL2 chillers (Nick)
 
* FCAL2 chillers (Nick)
* DIRC N2 Issues- North  
+
* Vacuum gatevalve problems and PLC-s (Nick)
 +
* DIRC N2 Issues
 +
*: North DIRC N2 flow (Scot)
 
*: New DIRC N2 controls   
 
*: New DIRC N2 controls   
 
* Other items
 
* Other items
 +
*: power on FCAL platform
 +
*: network switch in the tagger hall
 +
*: disconnected racks in the tagger hall
  
 
==Time/Location==
 
==Time/Location==
  
 
10:00am Thursday 25-Mar-2021
 
10:00am Thursday 25-Mar-2021

Latest revision as of 09:10, 25 March 2021

  • Announcements
  • Solenoid status
    State code in PLC (Nick)
    PXI issues (Brian)
  • BCAL temperature PLC controls stability (Nick)
  • GUIs for BCAL chiller controls (Hovanes)
    Snapshot of EPICS GUIs
  • Magnet power supply related temperature readouts (Scot)
  • FCAL HV controls modifications (Hovanes, Nick)
  • FCAL2 chillers (Nick)
  • Vacuum gatevalve problems and PLC-s (Nick)
  • DIRC N2 Issues
    North DIRC N2 flow (Scot)
    New DIRC N2 controls
  • Other items
    power on FCAL platform
    network switch in the tagger hall
    disconnected racks in the tagger hall

Time/Location

10:00am Thursday 25-Mar-2021