Difference between revisions of "Controls Meeting 25-Jul-2019"
From GlueXWiki
(Created page with "* Announcements * Solenoid status (Tim,Beni,Brian) ** Cooldown ** PXI * Goniometer controls ** Boards for linear stages (Tim, Nick). ** XPS Controllers (Nick, Hovanes) * New...") |
|||
Line 8: | Line 8: | ||
* New ComCal chiller controls | * New ComCal chiller controls | ||
* TOF HV upgrades (Hovanes) | * TOF HV upgrades (Hovanes) | ||
+ | * Tagger NMR | ||
* Test setup for power crates | * Test setup for power crates | ||
* DIRC installations | * DIRC installations |
Revision as of 16:29, 24 July 2019
- Announcements
- Solenoid status (Tim,Beni,Brian)
- Cooldown
- PXI
- Goniometer controls
- Boards for linear stages (Tim, Nick).
- XPS Controllers (Nick, Hovanes)
- New ComCal chiller controls
- TOF HV upgrades (Hovanes)
- Tagger NMR
- Test setup for power crates
- DIRC installations
- Other business
Time/Location
10:00AM Thursday 25-Jul-2019 CC B101