Difference between revisions of "Controls Meeting 25-Apr-2024"

From GlueXWiki
Jump to: navigation, search
 
Line 5: Line 5:
 
* PLC developments (Bobby, Josh)
 
* PLC developments (Bobby, Josh)
 
*# ECAL  chiller  
 
*# ECAL  chiller  
*::* Modbus interface
+
*#:* Modbus interface
*::* Flow monitoring
+
*#:* Flow monitoring
 
*# Dark room environment sensors  
 
*# Dark room environment sensors  
 
*# Fan control and fan status monitoring
 
*# Fan control and fan status monitoring

Latest revision as of 10:25, 25 April 2024

  • Announcements
  • Solenoid status
    • PXI code modifications (Brian,Hovanes,Beni)
  • PLC developments (Bobby, Josh)
    1. ECAL chiller
      • Modbus interface
      • Flow monitoring
    2. Dark room environment sensors
    3. Fan control and fan status monitoring
    4. ECAL HV crate resets and HV board interlocks
    5. EPICS screens
  • Status of the power for the ECAL racks (Tim, Scot)
  • ECAL and FCAL voltage controls (Hovanes)
  • New NMR probe and chassis tests (Tim)
  • PLC-related software licenses (Bobby, Josh)
  • Other items


Time/Location

10:00am Thursday 25-April-2024