Controls Meeting 23-Jan-2014

From GlueXWiki
Revision as of 10:21, 23 January 2014 by Hovanes (Talk | contribs) (Created page with "=Agenda= * Announcements * Minutes from previous meeting Controls Meeting 9-Jan-2014 * UPS requirements for Hall D *: Total maximum power consumed by PLC, location in the ha...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

  • Announcements
  • Minutes from previous meeting Controls Meeting 9-Jan-2014
  • UPS requirements for Hall D
    Total maximum power consumed by PLC, location in the hall (Dave)
    Total maximum power consumed by solenoid controls, location in the hall (Yi)
    Total maximum power consumed by motor controls, location in the hall (Hovanes)
    Expected power usage and required time duration during power failure for PLC device (Dave)
    Expected power usage and required time duration during power failure for solenoid controls (Yi)
    Expected power usage and required time duration during power failure for motor controls (Hovanes)

Time/Location

9:30AM Thurs 23-Jan-2014 CC A110