Difference between revisions of "Controls Meeting 20-Mar-2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 14: Line 14:
  
 
9:30AM Thurs 20-Mar-2014 CC A110
 
9:30AM Thurs 20-Mar-2014 CC A110
 +
 +
 +
=Minutes=
 +
 +
== UPS Requirements ==
 +
* Dave collected the information from Jonathan regarding the power for the valves
 +
* Yi would like to have the PXI system on the UPS as well (rated 300W)
 +
* Hovanes showed the layout of the [[media:UPSforHallDreqs.pptx | UPS requirements in Hall D]] (PXI was missing). Hovanes will send the requirements to Joe Beaufait on Friday.
 +
 +
== BCAL power supply interlocks ==
 +
* Dave showed [[media:bcal_ps_interlocks.pptx | slides]] explaining his work on the BCAL interlocks.
 +
* Encountered  strange problem that the 5V output modules on PoinIO did not provide enought current for the MPOD interlock input.
 +
* Dave will order CompactLogix extension modules to avoid PintIO all together, and use CompactLogix modules.
 +
* There was a request to change the button labels to adhere to Elton's convention.

Revision as of 11:51, 24 March 2014

Agenda


Time/Location

9:30AM Thurs 20-Mar-2014 CC A110


Minutes

UPS Requirements

  • Dave collected the information from Jonathan regarding the power for the valves
  • Yi would like to have the PXI system on the UPS as well (rated 300W)
  • Hovanes showed the layout of the UPS requirements in Hall D (PXI was missing). Hovanes will send the requirements to Joe Beaufait on Friday.

BCAL power supply interlocks

  • Dave showed slides explaining his work on the BCAL interlocks.
  • Encountered strange problem that the 5V output modules on PoinIO did not provide enought current for the MPOD interlock input.
  • Dave will order CompactLogix extension modules to avoid PintIO all together, and use CompactLogix modules.
  • There was a request to change the button labels to adhere to Elton's convention.