Difference between revisions of "Controls Meeting 14-Sep-2017"

From GlueXWiki
Jump to: navigation, search
 
Line 4: Line 4:
 
** solenoid cool down
 
** solenoid cool down
 
* Muon detector requirements for December (Elton)
 
* Muon detector requirements for December (Elton)
 +
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3389  GlueX-doc-3389] Preparations for CPP Beam Test
 
* FDC/CDC gas control mods (Nick,Beni)  
 
* FDC/CDC gas control mods (Nick,Beni)  
 
* Goni survey (Tim, Hovanes)
 
* Goni survey (Tim, Hovanes)

Latest revision as of 07:38, 14 September 2017

  • Announcements
  • Solenoid status (Tim,Beni)
    • UPS test
    • solenoid cool down
  • Muon detector requirements for December (Elton)
  • FDC/CDC gas control mods (Nick,Beni)
  • Goni survey (Tim, Hovanes)
  • NBX upgrade (Brian)
  • DIRC water system controls (Nick)
  • Other topics
    • FDC/CDC voltage EPICS IOC


Time/Location

10:00AM Thursday 14-Sep-2017 CC B101