Difference between revisions of "Controls Meeting 14-Sep-2017"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
* Goni survey (Tim, Hovanes)
 
* Goni survey (Tim, Hovanes)
 
* NBX upgrade (Brian)
 
* NBX upgrade (Brian)
 +
* DIRC water system controls (Nick)
 
* Other topics
 
* Other topics
 
** FDC/CDC voltage EPICS IOC
 
** FDC/CDC voltage EPICS IOC

Revision as of 07:53, 12 September 2017

  • Announcements
  • Solenoid status (Tim,Beni)
    • UPS test
    • solenoid cool down
  • Muon detector requirements for December (Elton)
  • FDC/CDC gas control mods (Nick,Beni)
  • Goni survey (Tim, Hovanes)
  • NBX upgrade (Brian)
  • DIRC water system controls (Nick)
  • Other topics
    • FDC/CDC voltage EPICS IOC


Time/Location

10:00AM Thursday 14-Sep-2017 CC B101