=Minutes=
 
=Minutes=
 +
 +
Present:  Elliott W, Mark S, Serguei P, Hovanes E, Dave B.
 +
 +
 +
 +
'''JInventory Plans'''
 +
 +
Serguei outlined plans for upgrade to the JInventory database. 
 +
 +
* Info on electronics boards will come from Fernando's spreadsheets.
 +
* Will use the housing hierarchy and a 5-level system for electronics boards.  Special GUI will be created for this with only relevant fields.
 +
* Barcode labels have been ordered.
 +
* He will propose new conventions for the Brand-Format-Model field.
 +
* Some mistakes in database will be fixed.
 +
* Some unneeded columns will be removed or moved to BFM table (e.g. documentation belongs with BFM, not item).
 +
* Will merge with CLAS12 effort and implement cable database (how to use TBD).
 +
* Will we derive the translation table from the JInventory database?
 +
 +
 +
 +
'''Solenoid Mapping'''
 +
 +
Must be ready to go prior to run, no time to figure things out while the magnet is cold.  Yi ordered a new PXI board for mapping channels.
 +
 +
 +
 +
'''FCAL Dark Room'''
 +
 +
Parts arriving, installation in progress.  Most sensors on order, looking for appropriate light sensors.
 +
 +
 +
 +
'''Solenoid Test'''
 +
 +
Mark et al. connected the Cryo group's HDR signal into our fast dump chain.  They will trigger a fast dump if there are immanent catastrophic problems in the cryo plant.
 +
 +
 +
 +
'''PLC Test Stand'''
 +
 +
This will be moved into the Rack Room (we are leaving the ARC building).  A new switch will be installed in the PLC test rack.  Dave's computer needs a home.  The equipment will be on the Hall D controls network, and Dave's computer on the development network.  Dave will reprogram devices accordingly.  Many devices in the test stand will eventually be deployed in the hall.
 +
 +
 +
 +
'''EPICS'''

Revision as of 15:43, 25 June 2013

Agenda

  • Announcements
  • Minutes from previous meeting 16-May-2013
  • Plans for JInventory database - Serguei Pozdniakov
  • Preparations for solenoid mapping - Dave L, Elliott
  • FCAL dark room update - John, Manuel, Dan
  • Cryo plant signals (HDR) to fast dump chain/SOE and PLC - Dave B, Mark, Scot
  • PLC test stand - Dave B
  • EPICS - Hovanes, Nerses
  • Solenoid update - Mark, Scot, Elliott
    • QD modifications
    • Strategy and plans
  • Counting House status - Hovanes
  • Other controls applications - Dave
    • Storing/retrieving PLC parameters
    • FDC cooling, target, BCAL cooling, etc.
  • Mantis task tracker
  • Midas elog


  • Future topics
    • Experiment Control Supervisor - Vardan, Elliott


Time/Location

9:30AM Thurs 13-Jun-2013 CC A110


Announcements

Next Meeting

9:30am Thurs 27-Jun-2013


Minutes

Present: Elliott W, Mark S, Serguei P, Hovanes E, Dave B.


JInventory Plans

Serguei outlined plans for upgrade to the JInventory database.

  • Info on electronics boards will come from Fernando's spreadsheets.
  • Will use the housing hierarchy and a 5-level system for electronics boards. Special GUI will be created for this with only relevant fields.
  • Barcode labels have been ordered.
  • He will propose new conventions for the Brand-Format-Model field.
  • Some mistakes in database will be fixed.
  • Some unneeded columns will be removed or moved to BFM table (e.g. documentation belongs with BFM, not item).
  • Will merge with CLAS12 effort and implement cable database (how to use TBD).
  • Will we derive the translation table from the JInventory database?


Solenoid Mapping

Must be ready to go prior to run, no time to figure things out while the magnet is cold. Yi ordered a new PXI board for mapping channels.


FCAL Dark Room

Parts arriving, installation in progress. Most sensors on order, looking for appropriate light sensors.


Solenoid Test

Mark et al. connected the Cryo group's HDR signal into our fast dump chain. They will trigger a fast dump if there are immanent catastrophic problems in the cryo plant.


PLC Test Stand

This will be moved into the Rack Room (we are leaving the ARC building). A new switch will be installed in the PLC test rack. Dave's computer needs a home. The equipment will be on the Hall D controls network, and Dave's computer on the development network. Dave will reprogram devices accordingly. Many devices in the test stand will eventually be deployed in the hall.


EPICS