Difference between revisions of "Controls Meeting 12-Jul-2018"
From GlueXWiki
(Created page with "* Announcements * Solenoid status (Tim,Beni,Brian) ** ADC calibrations * Goniometer (Tim, Hovanes) * ComCal ** Translation stages (Tim, Hovanes) ** Voltages (Hovanes, Nick) **...") |
|||
Line 7: | Line 7: | ||
** Voltages (Hovanes, Nick) | ** Voltages (Hovanes, Nick) | ||
** LED pulser (Hovanes) | ** LED pulser (Hovanes) | ||
− | ** Temperature monitoring ?? | + | ** Temperature monitoring and chiller ?? |
* DIRC controls | * DIRC controls | ||
** Water system (Nick) | ** Water system (Nick) |
Latest revision as of 17:03, 11 July 2018
- Announcements
- Solenoid status (Tim,Beni,Brian)
- ADC calibrations
- Goniometer (Tim, Hovanes)
- ComCal
- Translation stages (Tim, Hovanes)
- Voltages (Hovanes, Nick)
- LED pulser (Hovanes)
- Temperature monitoring and chiller ??
- DIRC controls
- Water system (Nick)
- Gas system (Nick)
- Voltages (Nick, Hovanes)
- LED Pulser (Hovanes)
- Other
Time/Location
10:00AM Thursday 12-Jul-2018 CC B101