Difference between revisions of "Controls Meeting 1-Nov-2018"

From GlueXWiki
Jump to: navigation, search
 
Line 4: Line 4:
 
* ComCal
 
* ComCal
 
** Timeline for testing, hall openings  
 
** Timeline for testing, hall openings  
** Temperature monitoring, tags and PVs (Nick)[[Media:Graphicallylocated sensors.png | GUI]
+
** Temperature monitoring, tags and PVs (Nick)[[Media:Graphicallylocated sensors.png | GUI]]
 
** Interlocks (Nick)
 
** Interlocks (Nick)
 
** LED pulser (Hovanes)
 
** LED pulser (Hovanes)

Latest revision as of 09:54, 1 November 2018

  • Announcements
  • Solenoid status (Tim,Beni,Brian)
    • Liquid level : sensors vs formulae
  • ComCal
    • Timeline for testing, hall openings
    • Temperature monitoring, tags and PVs (Nick) GUI
    • Interlocks (Nick)
    • LED pulser (Hovanes)
    • Voltages (Hovanes)
      Reset after interlock?
    • Chiller
    • Translation stages (Tim)
  • DIRC controls
    • Voltages (Nick, Hovanes)
    • LED Pulser (Hovanes)
    • Envoronemt (Nick)
    • Interlocks (Nick)
    • Scalers and Temperatures (Hovanes)
  • Other

Time/Location

10:00AM Thursday 1-Nov-2018 CC B101