Controls Meeting 06-Sep-2018
From GlueXWiki
Revision as of 21:09, 5 September 2018 by Hovanes (Talk | contribs) (Created page with "* Announcements * Solenoid status (Tim,Beni,Brian) ** Vacuum pump alarms ** Liquid level : sensors vs formulae ** ROOT GUIs on RHEL7 ** Time offset * ComCal ** Translation sta...")
- Announcements
- Solenoid status (Tim,Beni,Brian)
- Vacuum pump alarms
- Liquid level : sensors vs formulae
- ROOT GUIs on RHEL7
- Time offset
- ComCal
- Translation stages (Tim, Hovanes, Vanik)
- Voltages (Vanick, Nick)
- Interlocks for CAEN modules
- LED pulser (Hovanes, Sasha)
- Temperature monitoring (Nick)
- DIRC controls
- Voltages (Nick, Hovanes)
- MPOD situation
- LED Pulser (Hovanes)
- Scalers and Temperatures (Hovanes)
- Voltages (Nick, Hovanes)
- Other
Time/Location
10:00AM Thursday 06-Sep-2018 CC B101