Difference between revisions of "Coil Test Weekly Meeting 21-Oct-2010"

From GlueXWiki
Jump to: navigation, search
m
m
Line 9: Line 9:
 
'''Agenda'''
 
'''Agenda'''
  
 +
* Review next week - George, Bill, Glenn, Elliott
 +
** what to do about "Quench Protection" talk?
 
* Quench detector - Elliott
 
* Quench detector - Elliott
 
** how does it work during ramp up and down, given coil inductance of 6 H and 1 A/sec ramp rate?
 
** how does it work during ramp up and down, given coil inductance of 6 H and 1 A/sec ramp rate?
 
** do we need to reconfigure it?  balance between sub-coils?
 
** do we need to reconfigure it?  balance between sub-coils?
* Review next week - George, Elliott
 
** are all talks covered?
 
 
* Responsibilities during test - Jonathan, George, Elliott
 
* Responsibilities during test - Jonathan, George, Elliott
 
** 1500 A operation
 
** 1500 A operation

Revision as of 08:57, 21 October 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 21-Oct-2010 9:30 am ARC 428


Agenda

  • Review next week - George, Bill, Glenn, Elliott
    • what to do about "Quench Protection" talk?
  • Quench detector - Elliott
    • how does it work during ramp up and down, given coil inductance of 6 H and 1 A/sec ramp rate?
    • do we need to reconfigure it? balance between sub-coils?
  • Responsibilities during test - Jonathan, George, Elliott
    • 1500 A operation
    • turn-to-turn shorts
    • radial Heim column centering
    • LN2 and He heat leaks
    • LN2 and He thermal siphon
    • how do we determine when it is time to start warming up?
  • OSP status - Elliott
  • Hall probe - Mark S
  • Installation and commissioning status - all
    • pressure testing and certifications
    • pumping/purging
    • connection to cryo system
    • ODH on platform?
    • what else?
  • Magnet power supply and interlock commissioning - Mark S
    • shunt and ground fault detection
  • Controls racks - Scot
    • strain gauge and UPS interlocks
    • commissioning
    • anything else?
  • PLC programming/testing status - Mark W
    • UPS interlock
    • what's left?
  • EPICS - Hovanes
    • communication with PLC
    • connection to guard shack and notification conditions
    • pager status and strategy
  • HMI and EWEB programming - Yi, Hovanes
    • current status
  • Coil repair status - George
  • Solenoid reviews 25-26 Oct and 7-Dec
  • Purchase of another PLC and Ethernet module - Elliott
  • Hall D Technical web page
  • Preparations for testing next coil - George, Scot, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring
    • connectors on next coil
    • what else?