Difference between revisions of "Coil Test Weekly Meeting 21-Oct-2010"

From GlueXWiki
Jump to: navigation, search
m
m
Line 12: Line 12:
 
** are all talks covered?
 
** are all talks covered?
 
* Responsibilities during test - Jonathan, George, Elliott
 
* Responsibilities during test - Jonathan, George, Elliott
 +
** 1500 A operation
 +
** turn-to-turn shorts
 +
** radial Heim column centering
 +
** LN2 and He heat leaks
 +
** LN2 and He thermal siphon
 +
** how do we determine when it is time to start warming up?
 
* OSP status - Elliott
 
* OSP status - Elliott
 
* Hall probe - Mark S
 
* Hall probe - Mark S

Revision as of 10:09, 20 October 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 21-Oct-2010 9:30 am ARC 428


Agenda

  • Review next week - George, Elliott
    • are all talks covered?
  • Responsibilities during test - Jonathan, George, Elliott
    • 1500 A operation
    • turn-to-turn shorts
    • radial Heim column centering
    • LN2 and He heat leaks
    • LN2 and He thermal siphon
    • how do we determine when it is time to start warming up?
  • OSP status - Elliott
  • Hall probe - Mark S
  • Installation and commissioning status - all
    • pressure testing and certifications
    • pumping/purging
    • connection to cryo system
    • ODH on platform?
    • what else?
  • Magnet power supply and interlock commissioning - Mark S
    • shunt and ground fault detection
  • Controls racks - Scot
    • strain gauge and UPS interlocks
    • commissioning
    • anything else?
  • PLC programming/testing status - Mark W
    • UPS interlock
    • what's left?
  • EPICS - Hovanes
    • communication with PLC
    • connection to guard shack and notification conditions
    • pager status and strategy
  • HMI and EWEB programming - Yi, Hovanes
    • current status
  • Coil repair status - George
  • Solenoid reviews 25-26 Oct and 7-Dec
  • Purchase of another PLC and Ethernet module - Elliott
  • Hall D Technical web page
  • Preparations for testing next coil - George, Scot, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring
    • connectors on next coil
    • what else?