Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 16-Sep-2010 9:30am ARC 428


Agenda

  • DOE review 28-Sep - George, Elliott
    • it would be great if we were pumping/purging by then, flowing LN2 would even be better!
  • Installation status
    • what's left?
    • when do we give two weeks notice to Errol?
    • when can we begin pumping/purging?
    • what's the deal with the N2 vent line?
  • Test plan - Josh
    • tags, HMI, etc.
    • Conduct of Operations
  • Magnet power supply and interlock commissioning - Cody
    • latest status
    • strainers?
  • Controls racks - Scot
    • what's left?
    • Strain gauge interlock
  • PLC programming/testing status - Mark W
    • what's left?
    • backup PLC programmer?
    • tutorial?
  • UPS status - Mark W, Elliott
    • relay in interlock system
    • connection to PLC
  • EPICS <--> PLC communications - Wesley
    • what PV's and tags are needed?
    • under what circumstances do we notify the guard shack?
    • can EPICS connect to all tags?
  • HMI and EWEB programming - Yi, Hovanes
    • status
    • tutorial?
  • Coil repair status - George
  • OSP documents and review - Elliott, George
  • Preparations for testing next coil - George, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring