Difference between revisions of "Cart Operation Plan"
From GlueXWiki
Line 9: | Line 9: | ||
*Moving the cart from one position to another (Alcove / Platform) | *Moving the cart from one position to another (Alcove / Platform) | ||
+ | :#Carriage must be moved to the marked transport position and secured in place and the outrigger wheel must be moved to its marked transport position and secured in place. | ||
+ | :#Three people, all pushing and watching for obstructions will move the cart and align it in its new position. | ||
*Cart in the platform position | *Cart in the platform position | ||
− | : | + | :#Ensure that the cart is secured with the levelers extended and the wheels locked. |
− | : | + | :#Verify that the AC limit switches are correctly calibrated. |
− | :#Must have at least 3 people on the platform to move the carriage. | + | :#Cart must have motion locks enabled and outriggers tightened before use. |
− | :# | + | :#Moving the carriage |
+ | :#Must have at least 3 people on the platform to move the carriage on top of the cart. | ||
+ | :#Position the outrigger on the longest side of the carriage and furthest from the cart. | ||
*Cart in alcove position | *Cart in alcove position | ||
− | : | + | :#Ensure that the cart is fastened to the alignment angles and the the cart levelers and wheel locks are engaged. |
− | : | + | :#Check for clearance through the angular travel before turning system over to remote control. |
− | : | + | :#Moving carriage |
+ | :#Enable cart for remote control by ensuring that the cart computer is on and the green light on the AC interlock is turned on. | ||
:*Operating cart under remote control | :*Operating cart under remote control | ||
'''DRAFT''' | '''DRAFT''' |
Revision as of 16:13, 27 July 2006
Cart Operation Plan
DRAFT
- People authorized to perform the following procedures.
- Eric Scott
- Moving the cart from one position to another (Alcove / Platform)
- Carriage must be moved to the marked transport position and secured in place and the outrigger wheel must be moved to its marked transport position and secured in place.
- Three people, all pushing and watching for obstructions will move the cart and align it in its new position.
- Cart in the platform position
- Ensure that the cart is secured with the levelers extended and the wheels locked.
- Verify that the AC limit switches are correctly calibrated.
- Cart must have motion locks enabled and outriggers tightened before use.
- Moving the carriage
- Must have at least 3 people on the platform to move the carriage on top of the cart.
- Position the outrigger on the longest side of the carriage and furthest from the cart.
- Cart in alcove position
- Ensure that the cart is fastened to the alignment angles and the the cart levelers and wheel locks are engaged.
- Check for clearance through the angular travel before turning system over to remote control.
- Moving carriage
- Enable cart for remote control by ensuring that the cart computer is on and the green light on the AC interlock is turned on.
- Operating cart under remote control
DRAFT