Calibration Workflow

From GlueXWiki
Revision as of 16:44, 30 January 2017 by Sdobbs (Talk | contribs) (Created page with "__TOC__ = Workflow = === Starting a new Run Period === # Calibrate RF # Basic detector alignment [global + ADC/TDC offsets] # TOF calibration # Track-based alignment # High...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Workflow

Starting a new Run Period

  1. Calibrate RF
  2. Basic detector alignment [global + ADC/TDC offsets]
  3. TOF calibration
  4. Track-based alignment
  5. Higher level alignment

Diagram

To come