+ | = Job Structure = | ||
+ | |||
+ | Currently 3 "passes" through the data are performed. The first pass tries to do as many calibrations as possible with one file of data. The second pass tries to do calibrations that need a larger data set. The final pass runs through a full run to use the full statistics in a run and to generate outputs for other calibration procedures that can't be done automatically yet (e.g. pi0 calibrations). | ||
+ | |||
+ | The plugins that are run on each pass are: | ||
+ | * '''Pass 1''' | ||
+ | ** Step 1 - RF_online | ||
+ | ** Step 2 - HLDetectorTiming (coarse timing+ADC/TDC alignment),TOF_TDC_shift | ||
+ | ** Step 3 - HLDetectorTiming (track-based timing),BCAL_TDC_Timing (timewalks) | ||
+ | * '''Pass 2''' | ||
+ | ** Step 1 - PS_timing,TAGH_timewalk,BCAL_attenlength_gainratio,BCAL_TDC_Timing (full) | ||
+ | ** Step 2 - st_tw_corr_auto | ||
+ | * '''Pass 3''' | ||
+ | ** HLDetectorTiming,PSC_TW,BCAL_gainmatrix,FCALgains,FCALpedestals,ST_Tresolution,ST_Propagation_Time,p2gamma_hists,imaging,pedestal_online,BCAL_LEDonline,PS_timing | ||
+ | |||
+ | = Output = | ||
= Calibration Challenge = | = Calibration Challenge = | ||
Line 6: | Line 24: | ||
* [[Calibration Challenge|Calibration Challenge 1]] | * [[Calibration Challenge|Calibration Challenge 1]] | ||
− | = Organization = | + | = Old Planning = |
+ | |||
+ | == Organization == | ||
* The jobs will be submitted every Tuesday at noon, JLab time. | * The jobs will be submitted every Tuesday at noon, JLab time. | ||
Line 13: | Line 33: | ||
* The output of the jobs will be stored in ... | * The output of the jobs will be stored in ... | ||
− | = Run Ranges = | + | == Run Ranges == |
The following runs will be processed: | The following runs will be processed: | ||
Line 20: | Line 40: | ||
* 2931, 3079, 3179, 3180, 3183, 3185 | * 2931, 3079, 3179, 3180, 3183, 3185 | ||
− | = Calibrations = | + | == Calibrations == |
=== Job Requirements === | === Job Requirements === | ||
Line 46: | Line 66: | ||
* TOF calibrations - https://halldsvn.jlab.org/repos/trunk/home/zihlmann/TOF_calib/ | * TOF calibrations - https://halldsvn.jlab.org/repos/trunk/home/zihlmann/TOF_calib/ | ||
− | = Code = | + | == Code == |
The current code can be obtained at | The current code can be obtained at | ||
Line 55: | Line 75: | ||
The ROOT library directory can be found at: | The ROOT library directory can be found at: | ||
... | ... | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 00:29, 9 March 2016
Contents
=
Job Structure
Currently 3 "passes" through the data are performed. The first pass tries to do as many calibrations as possible with one file of data. The second pass tries to do calibrations that need a larger data set. The final pass runs through a full run to use the full statistics in a run and to generate outputs for other calibration procedures that can't be done automatically yet (e.g. pi0 calibrations).
The plugins that are run on each pass are:
- Pass 1
- Step 1 - RF_online
- Step 2 - HLDetectorTiming (coarse timing+ADC/TDC alignment),TOF_TDC_shift
- Step 3 - HLDetectorTiming (track-based timing),BCAL_TDC_Timing (timewalks)
- Pass 2
- Step 1 - PS_timing,TAGH_timewalk,BCAL_attenlength_gainratio,BCAL_TDC_Timing (full)
- Step 2 - st_tw_corr_auto
- Pass 3
- HLDetectorTiming,PSC_TW,BCAL_gainmatrix,FCALgains,FCALpedestals,ST_Tresolution,ST_Propagation_Time,p2gamma_hists,imaging,pedestal_online,BCAL_LEDonline,PS_timing
Output
Calibration Challenge
Old Planning
Organization
- The jobs will be submitted every Tuesday at noon, JLab time.
- The jobs will be run from the gxproj3 account [parallel use with EventStore jobs]
- The output of the jobs will be stored in ...
Run Ranges
The following runs will be processed:
RunPeriod-2015-03
- 2931, 3079, 3179, 3180, 3183, 3185
Calibrations
Job Requirements
Each calibration process should include the following:
- Plugin stored in standard location
- ROOT/other scripts stored in standard location
- https://halldsvn.jlab.org/repos/trunk/sim-recon/src/scripts/calibrations ?
- Individual git repos?
- Output to files
- QA routines
What is Being Run
The following plugins are currently being run:
- RF_online (RF signal)
- BCAL_TDC_Timing
- HLDetectorTiming
- PSC_TW
Working on adding:
- BCAL_attenlength_gainratio
- BCAL gains - /work/halld/home/wmcginle/Gain_Calib
- TOF calibrations - https://halldsvn.jlab.org/repos/trunk/home/zihlmann/TOF_calib/
Code
The current code can be obtained at
svn co https://halldsvn.jlab.org/repos/trunk/home/sdobbs/calibration_train/
The ROOT library directory can be found at: ...