Preliminary Run Plan
Activity Duration (PAC Days) Current Target Collimator Radiator Comment
Full target (Production) 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Empty Target 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Diamond Alignment 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Trigger Commissioning 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Beam Energy Calibration 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
TAC Runs 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107