CPP and NPP Run Conditions

From GlueXWiki
Revision as of 08:27, 15 March 2022 by Elton (Talk | contribs)

Jump to: navigation, search
Preliminary Run Plan
Activity Duration (PAC Days) Current Target Collimator Radiator
Production 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107 TAC Runs 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107