Difference between revisions of "CPP and NPP Run Conditions"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
|-
 
|-
 
| style="text-align:left" | Full target (Production)  ||  20 || 27 nA|| Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107  
 
| style="text-align:left" | Full target (Production)  ||  20 || 27 nA|| Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107  
| style="text-align:left" |
+
| style="text-align:left" | Alternate 0/90 deg diamond configuration
 
|-
 
|-
 
| style="text-align:left" | Empty Target  ||  1.5? || 27 nA || - || 3.4 mm || JD70-103 or JD70-107  
 
| style="text-align:left" | Empty Target  ||  1.5? || 27 nA || - || 3.4 mm || JD70-103 or JD70-107  

Revision as of 08:54, 15 March 2022

Preliminary Run Plan
Activity Duration (PAC Days) Current Target Collimator Radiator Comment
Full target (Production) 20 27 nA Pb (0.3 mm) 3.4 mm JD70-103 or JD70-107 Alternate 0/90 deg diamond configuration
Empty Target 1.5? 27 nA - 3.4 mm JD70-103 or JD70-107 Run at higher current?
Diamond Alignment 0.5? 100 nA? Pb (0.3 mm) 3.4 mm JD70-103 and JD70-107
Trigger Commissioning 1? 100 nA? Pb (0.3 mm) 3.4 mm JD70-103 or JD70-107
Beam Energy Calibration 0.5? 100 nA Pb (0.3 mm) 3.4 mm JD70-103 or JD70-107 Collimator Blocking for 5 min, periodically
TAC Runs 1.5? 27 - 3.4 mm JD70-103 or JD70-107