Difference between revisions of "CPP and NPP Run Conditions"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
! Activity  !! Duration (PAC Days) !! Current !! Target !! Collimator !! Radiator !! Comment
 
! Activity  !! Duration (PAC Days) !! Current !! Target !! Collimator !! Radiator !! Comment
 
|-
 
|-
| style="text-align:left" | Full target (Production)  ||  20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
+
| style="text-align:left" | Full target (Production)  ||  20 || 27 nA|| Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 ||
 
|-
 
|-
| style="text-align:left" | Empty Target  ||  1.5? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
+
| style="text-align:left" | Empty Target  ||  1.5? || 27 nA || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 || Run at higher current?
 
|-
 
|-
| style="text-align:left" | Diamond Alignment  ||  0.5? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||  
+
| style="text-align:left" | Diamond Alignment  ||  0.5? || 100 nA?  || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 ||  
 
|-
 
|-
| style="text-align:left" | Trigger Commissioning ||  1? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
+
| style="text-align:left" | Trigger Commissioning ||  1? || 100 nA? || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 ||  
 
|-
 
|-
| style="text-align:left" | Beam Energy Calibration  ||  0.5? || 100 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 || Collimator Blocking, 5 min, periodically
+
| style="text-align:left" | Beam Energy Calibration  ||  0.5? || 100 nA || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 || Collimator Blocking for 5 min, periodically
 
|-
 
|-
| style="text-align:left" | TAC Runs  ||  1.5? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
+
| style="text-align:left" | TAC Runs  ||  1.5? || 27 || Pb (0.3 mm) || 3.4 mm || JD70-103 / JD70-107 ||
 
|}
 
|}

Revision as of 08:46, 15 March 2022

Preliminary Run Plan
Activity Duration (PAC Days) Current Target Collimator Radiator Comment
Full target (Production) 20 27 nA Pb (0.3 mm) 3.4 mm JD70-103 / JD70-107
Empty Target 1.5? 27 nA Pb (0.3 mm) 3.4 mm JD70-103 / JD70-107 Run at higher current?
Diamond Alignment 0.5? 100 nA? Pb (0.3 mm) 3.4 mm JD70-103 / JD70-107
Trigger Commissioning 1? 100 nA? Pb (0.3 mm) 3.4 mm JD70-103 / JD70-107
Beam Energy Calibration 0.5? 100 nA Pb (0.3 mm) 3.4 mm JD70-103 / JD70-107 Collimator Blocking for 5 min, periodically
TAC Runs 1.5? 27 Pb (0.3 mm) 3.4 mm JD70-103 / JD70-107