Difference between revisions of "CPP and NPP Run Conditions"

From GlueXWiki
Jump to: navigation, search
Line 14: Line 14:
 
| style="text-align:left" | Trigger Commissioning ||  1? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
 
| style="text-align:left" | Trigger Commissioning ||  1? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
 
|-
 
|-
| style="text-align:left" | Beam Energy Calibration  ||  0.5? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
+
| style="text-align:left" | Beam Energy Calibration  ||  0.5? || 100 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 || Collimator Blocking, 5 min, periodically
 
|-
 
|-
 
| style="text-align:left" | TAC Runs  ||  1.5? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
 
| style="text-align:left" | TAC Runs  ||  1.5? || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
 
|}
 
|}

Revision as of 08:43, 15 March 2022

Preliminary Run Plan
Activity Duration (PAC Days) Current Target Collimator Radiator Comment
Full target (Production) 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Empty Target 1.5? 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Diamond Alignment 0.5? 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Trigger Commissioning 1? 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Beam Energy Calibration 0.5? 100 Pb (0.3 mm) 3.4 JD70-103 / JD70-107 Collimator Blocking, 5 min, periodically
TAC Runs 1.5? 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107