Difference between revisions of "CPP and NPP Run Conditions"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
! Activity  !! Duration (PAC Days) !! Current !! Target !! Collimator !! Radiator !! Comment
 
! Activity  !! Duration (PAC Days) !! Current !! Target !! Collimator !! Radiator !! Comment
 
|-
 
|-
| Full target (Production)  ||  20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
+
| style="text-align:left" | Full target (Production)  ||  20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
 
|-
 
|-
 
| Empty Target  ||  20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||
 
| Empty Target  ||  20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 ||

Revision as of 08:37, 15 March 2022

Preliminary Run Plan
Activity Duration (PAC Days) Current Target Collimator Radiator Comment
Full target (Production) 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Empty Target 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Diamond Alignment 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Trigger Commissioning 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Beam Energy Calibration 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
TAC Runs 20 27 Pb (0.3 mm) 3.4 JD70-103 / JD70-107
Caption text
Header text Header text Header text
Example Example Example
Example Example Example
Example Example Example