Difference between revisions of "CDC Construction Details"

From GlueXWiki
Jump to: navigation, search
(Global Documents)
(Global Documents)
Line 4: Line 4:
 
== Global Documents ==
 
== Global Documents ==
 
The initial [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1438 CMU Contract Submission] contains the contract, the Statement of Work (SOW) and the Technical Review Report. These documents were signed off on by both Jefferson Lab and CMU and the contract for construction started on May 15, 2010. As part of this work, CMU has provided an overall [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1619 Quality Assurance Plan] for the construction of the CDC.
 
The initial [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1438 CMU Contract Submission] contains the contract, the Statement of Work (SOW) and the Technical Review Report. These documents were signed off on by both Jefferson Lab and CMU and the contract for construction started on May 15, 2010. As part of this work, CMU has provided an overall [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1619 Quality Assurance Plan] for the construction of the CDC.
 +
 +
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1438 GlueX-doc:1438] Contract package - (Feb.2010).
 +
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1619 GlueX-doc:1619] Quality assurance plan - (Feb. 2010).
  
 
== Assembly documents ==
 
== Assembly documents ==

Revision as of 14:36, 14 October 2010

_ _

Introduction

This page provides links to the documentation on the construction of the CDC at Carnegie Mellon University.

Global Documents

The initial CMU Contract Submission contains the contract, the Statement of Work (SOW) and the Technical Review Report. These documents were signed off on by both Jefferson Lab and CMU and the contract for construction started on May 15, 2010. As part of this work, CMU has provided an overall Quality Assurance Plan for the construction of the CDC.

  1. GlueX-doc:1438 Contract package - (Feb.2010).
  2. GlueX-doc:1619 Quality assurance plan - (Feb. 2010).

Assembly documents