(Created page with "The goal is to assess the beam background due to a possible halo hitting some of the material around the beam line. This will be use to check if using the PRad target for TAC...")
 
 
Line 1: Line 1:
 
The goal is to assess the beam background due to a possible halo hitting some of the material around the beam line. This will be use to check if  using the PRad target for TAC runs is feasible.  
 
The goal is to assess the beam background due to a possible halo hitting some of the material around the beam line. This will be use to check if  using the PRad target for TAC runs is feasible.  
  
Do a run at different current, no radiator, TAC in, target full:  
+
Do a run at different current, no radiator, TAC in, target in whatever condition for standard TAC run (presumably EMPTY):  
  
 
*10 min at 10nA
 
*10 min at 10nA

Latest revision as of 17:25, 5 April 2018

The goal is to assess the beam background due to a possible halo hitting some of the material around the beam line. This will be use to check if using the PRad target for TAC runs is feasible.

Do a run at different current, no radiator, TAC in, target in whatever condition for standard TAC run (presumably EMPTY):

  • 10 min at 10nA
  • 10 min at 50nA
  • 10 min at 100nA
  • 10 min at 150nA
  • 10 min at 250nA

Repeat several times throughout Fall/Spring run periods to check stability and possible change with beam tune.