Beam commissioning: Fall 2015

From GlueXWiki
Revision as of 17:03, 12 January 2016 by Somov (Talk | contribs)

Jump to: navigation, search
  • Acceptance corrected photon spectrum measured with the PS

Acceptance corrected photon spectrum measured with the PS