Difference between revisions of "Beam Test Meeting Mon. Apr. 09, 2012"
From GlueXWiki
(Created page with "== Agenda == [http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf FCAL GEANT simulations] (Kei)") |
(→Agenda) |
||
Line 1: | Line 1: | ||
== Agenda == | == Agenda == | ||
[http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf FCAL GEANT simulations] (Kei) | [http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf FCAL GEANT simulations] (Kei) | ||
+ | |||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | -Hall B going to 3 pass = ~2.5 GeV until next Wednesday | ||
+ | |||
+ | -FCAL simulation presentation, see link above | ||
+ | |||
+ | -BCAL – see elog for daily changes | ||
+ | |||
+ | -Temp of chiller dropped 5C today to reduce temp | ||
+ | |||
+ | -need to understand oscillations | ||
+ | |||
+ | -need to understand chiller and internal temps better | ||
+ | |||
+ | -need to add calibrated remote counter to BCAL DAQ | ||
+ | |||
+ | -some channels have overflow bit, need to understand |
Latest revision as of 14:38, 9 April 2012
Agenda
FCAL GEANT simulations (Kei)
Minutes
-Hall B going to 3 pass = ~2.5 GeV until next Wednesday
-FCAL simulation presentation, see link above
-BCAL – see elog for daily changes
-Temp of chiller dropped 5C today to reduce temp
-need to understand oscillations
-need to understand chiller and internal temps better
-need to add calibrated remote counter to BCAL DAQ
-some channels have overflow bit, need to understand