Baby BCAL at JLab

From GlueXWiki
Revision as of 13:59, 18 August 2023 by Jzarling (Talk | contribs)

Jump to: navigation, search
This page is intended to summarize JLab work with the baby BCAL in 2023 for the EPIC (EIC) Barrel EM Calorimeter 

Note that we agreed to use the name "Baby BCAL" in June 2023. Previously one may encounter use of the name "mini BCAL" as well.

Photos & Sketches

March 2023 Beam Tests

Goals and Hall D PS Setup

Pre-Beam

Logbook Entries

Run Log

  1. Raw Mode


Cosmic Tests, started August 2023

Configuration

We attempted to use as close to the same configuration as in March 2023 as possible. Below is a list of cabling and configurations.

Note: North=Downstream, South=Upstream. These are now arbitrary labels. Downstream/north is located closer to the collimator cave, and upstream/south is located closer to the solenoid.

SiPM Modules

  • Used upstream & downstream modules 49 in their corresponding up/down sides (as labeled on baby BCAL)
    • Upstream module plugged into J7, downstream into J8 to match March 2023 config.
    • Standard LV=5 V setting for low voltage power to modules
    • Upstream bias voltage = 75 V, downstream bias voltage = 74 V (to match start of March 2023 conditions). See logbook entry for later voltage settings: https://logbooks.jlab.org/entry/4151946.
    • Scripts to turn bias and LV on/off can be found on gluon machines at: /gluonfs1/home/hdops/bcal_cosmic/august2023/
  • Cabling: same as March 2023. Lemo cables labeled AS0-AS15 and AN0-AN15. These are plugged into crate U1-7-TOP (crate number 94 in software). Slot 7 is north, slot 8 is south.

Analysis