Difference between revisions of "BLTWG Meeting 6/26/2008"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 7: Line 7:
 
# [http://www.jlab.org/~somov/cave_bg/note_cave_bg.pdf Status on the collimator cave background studies] - ''Alex''
 
# [http://www.jlab.org/~somov/cave_bg/note_cave_bg.pdf Status on the collimator cave background studies] - ''Alex''
 
# [http://zeus.phys.uconn.edu/halld/bltwghome/UConn-Jlab_contract-7-2007/milestone-6-2008/report-6-2008.pdf Status report on tagger microscope prototyping] - ''R. Jones''
 
# [http://zeus.phys.uconn.edu/halld/bltwghome/UConn-Jlab_contract-7-2007/milestone-6-2008/report-6-2008.pdf Status report on tagger microscope prototyping] - ''R. Jones''
 +
# Discussion: strategy for beam tests in Hall B - ''R. Jones''
 +
# Agreement for diamond R&D - ''R. Jones, E. Aschenauer''

Revision as of 10:02, 26 June 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Status on the collimator cave background studies - Alex
  2. Status report on tagger microscope prototyping - R. Jones
  3. Discussion: strategy for beam tests in Hall B - R. Jones
  4. Agreement for diamond R&D - R. Jones, E. Aschenauer