Difference between revisions of "BLTWG Meeting 6/12/2008"
From GlueXWiki
(→Agenda) |
|||
Line 2: | Line 2: | ||
* Place: EVO and ESNET (with telephone bridge) | * Place: EVO and ESNET (with telephone bridge) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Jim, Alex, Elke, Dan S., Dan D., Richard |
===Agenda=== | ===Agenda=== | ||
# Progress report on beam line shielding simulations - ''Alex'' | # Progress report on beam line shielding simulations - ''Alex'' |
Revision as of 10:09, 12 June 2008
- Time: 10:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: Jim, Alex, Elke, Dan S., Dan D., Richard
Agenda
- Progress report on beam line shielding simulations - Alex
- Report on the status of the accelerator interface document - Jim
- Report from the CHESS User's Meeting - Richard
- Discussion of the updated pair spectrometer proposal - Hratchya/Jim