Difference between revisions of "BLTWG Meeting 12/18/2008"

From GlueXWiki
Jump to: navigation, search
(Notes)
(Notes)
Line 17: Line 17:
  
 
# Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on [[Pair_Spectrometer|the pair spectrometer wiki page]]
 
# Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on [[Pair_Spectrometer|the pair spectrometer wiki page]]
 +
# There was discussion about finding a package of work that might be suitable for writing a MOU with the YERPHI group.  We are looking for a set of engineering and construction tasks that can be specified clearly and the work can proceed relatively independently.

Revision as of 11:31, 18 December 2008

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: R. Jones, J. Stewart, T. Whitlatch, I. Senderovich, A. Somov


Agenda

  1. Changes to the November Review wiki page
  2. Comparison between ANSYS and TOSCA fields
  3. Goals for diamond assessment at CHESS in 3/2009
  4. Budget changes for tagger hodoscope


Notes

  1. Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on the pair spectrometer wiki page
  2. There was discussion about finding a package of work that might be suitable for writing a MOU with the YERPHI group. We are looking for a set of engineering and construction tasks that can be specified clearly and the work can proceed relatively independently.