Difference between revisions of "BLTWG Meeting 12/18/2008"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Notes)
Line 11: Line 11:
 
# Goals for diamond assessment at CHESS in 3/2009
 
# Goals for diamond assessment at CHESS in 3/2009
 
# Budget changes for tagger hodoscope
 
# Budget changes for tagger hodoscope
 +
 +
  
 
==Notes==
 
==Notes==
  
 
# Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on [[Pair_Spectrometer|the pair spectrometer wiki page]]
 
# Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on [[Pair_Spectrometer|the pair spectrometer wiki page]]

Revision as of 11:29, 18 December 2008

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: R. Jones, J. Stewart, T. Whitlatch, I. Senderovich, A. Somov


Agenda

  1. Changes to the November Review wiki page
  2. Comparison between ANSYS and TOSCA fields
  3. Goals for diamond assessment at CHESS in 3/2009
  4. Budget changes for tagger hodoscope


Notes

  1. Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on the pair spectrometer wiki page