Difference between revisions of "BLTWG Meeting 11/12/2012"

From GlueXWiki
Jump to: navigation, search
(Organization)
(Notes)
 
(7 intermediate revisions by the same user not shown)
Line 10: Line 10:
 
# Report from accelerator-GlueX contact person - ''Todd Satogata''
 
# Report from accelerator-GlueX contact person - ''Todd Satogata''
 
# Progress toward the UConn construction contract - ''Richard''
 
# Progress toward the UConn construction contract - ''Richard''
# Radiator development update, upcoming CHESS run - ''Brendan''
+
# Radiator development update, [http://zeus.phys.uconn.edu/halld/diamonds/Zygo/XY_Cuts/ early results] from just finished CHESS run - ''Brendan''
 
# [http://faculty.cua.edu/sober/HallD/Scatter_in_Tosca_rays.html Update on tagger fixed array design] - ''Dan''
 
# [http://faculty.cua.edu/sober/HallD/Scatter_in_Tosca_rays.html Update on tagger fixed array design] - ''Dan''
 
#: [http://faculty.cua.edu/sober/HallD/transition_region.html  Transition between fixed-array and microscope ]
 
#: [http://faculty.cua.edu/sober/HallD/transition_region.html  Transition between fixed-array and microscope ]
 
#: [http://faculty.cua.edu/sober/HallD/Compare_trajectories.html  Previous links ]
 
#: [http://faculty.cua.edu/sober/HallD/Compare_trajectories.html  Previous links ]
 +
 +
===Notes===
 +
* Horizontal cut through Casey 3x3 [[Image:Casey_hor.bmp]]
 +
 +
 +
* Vertical cut through Casey 3x3 [[Image:Casey_ver.bmp]]
 +
 +
 +
* Horizontal cut through S150 5x5 [[Image:S150_hor.bmp]]
 +
 +
 +
* Vertical cut through S150 5x5 [[Image:S150_ver.bmp]]

Latest revision as of 12:25, 14 November 2012

Organization

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id ??? ????)
  • Connecting: instructions are here
  • Present: Richard J., James M., Yi Q., Alex S., Hovanes E., Curtis M., Franz K., and Dan S.

Agenda

  1. Announcements
  2. Report from accelerator-GlueX contact person - Todd Satogata
  3. Progress toward the UConn construction contract - Richard
  4. Radiator development update, early results from just finished CHESS run - Brendan
  5. Update on tagger fixed array design - Dan
    Transition between fixed-array and microscope
    Previous links

Notes

  • Horizontal cut through Casey 3x3 Casey hor.bmp


  • Vertical cut through Casey 3x3 Casey ver.bmp


  • Horizontal cut through S150 5x5 S150 hor.bmp


  • Vertical cut through S150 5x5 S150 ver.bmp