BLTWG Meeting 11/11/2013

From GlueXWiki
Revision as of 12:07, 11 November 2013 by Somov (Talk | contribs) (Agenda)

Jump to: navigation, search

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Update from Accelerator Liaison - Todd
  3. 12-GeV Software Review
  4. Racks location in the Tagger Hall Fernando/Tim/Alex
  1. Beam Commissioning Plan - Elton
  2. Update on the fixed tagger hodoscope - Franz
  3. Update on mapping the tagger and PS - Tim
  4. Update on the microscope electronics - Alex B.
  5. Status of the microscope construction - Ann Marie
  6. Update on pair spectrometer detector - Ivan
  7. any other business

Notes

Original text from GlueX-doc

    Members of the GlueX collaboration developed the beam-line calibration procedures for photon running in Hall-B during the 6-GeV era. This included tools to determine photon flux, photon energy and the degree of photon polarization. While we feel that it will be relatively straightforward to implement the older Hall-B procedures in GlueX, the relevant individuals have been focussed on improving hardware to eliminate some of the problems that hindered this work in Hall-B