Difference between revisions of "BLTWG Meeting 10/31/2011"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 7: Line 7:
 
# Announcements
 
# Announcements
 
# Plans for diamond radiator fabrication at Glasgow - ''K. Livingston''
 
# Plans for diamond radiator fabrication at Glasgow - ''K. Livingston''
# [media:Beamtest-Spring-2011_proto.pdf|Beam test results for the microscope prototype] - ''R. Jones''
+
# [image:Beamtest-Spring-2011_proto.pdf|Beam test results for the microscope prototype] - ''R. Jones''
# [media:Beamtest-Spring-2011_Active_Collimator.pdf|Beam test results for the active collimator] - ''R. Jones''
+
# [image:Beamtest-Spring-2011_Active_Collimator.pdf|Beam test results for the active collimator] - ''R. Jones''
 
# State of the simulation of pair spectrometer and polarimeter - ''discussion''
 
# State of the simulation of pair spectrometer and polarimeter - ''discussion''
  
 
===Notes===
 
===Notes===

Revision as of 10:58, 31 October 2011

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 10-1655)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Plans for diamond radiator fabrication at Glasgow - K. Livingston
  3. [image:Beamtest-Spring-2011_proto.pdf|Beam test results for the microscope prototype] - R. Jones
  4. [image:Beamtest-Spring-2011_Active_Collimator.pdf|Beam test results for the active collimator] - R. Jones
  5. State of the simulation of pair spectrometer and polarimeter - discussion

Notes