Difference between revisions of "BLTWG Meeting 10/31/2011"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id ???) * Connecting: instructions are here * Present: ===Agenda=== # A...")
 
Line 1: Line 1:
 
* Time: 11:30 EST
 
* Time: 11:30 EST
* Place: ESNET and EVO (with telephone bridge id ???)  
+
* Place: ESNET and EVO (with telephone bridge id 10-1655)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Present:  
 
* Present:  

Revision as of 10:34, 31 October 2011

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 10-1655)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Plans for diamond radiator fabrication at Glasgow - K. Livingston
  3. Beam test results for the microscope prototype - R. Jones
  4. Beam test results for the active collimator - R. Jones
  5. State of the simulation of pair spectrometer and polarimeter - discussion

Notes