Difference between revisions of "BLTWG Meeting 1/17/2008"
From GlueXWiki
(→Agenda) |
|||
Line 5: | Line 5: | ||
===Agenda=== | ===Agenda=== | ||
# Agree on a set of milestones to be achieved by our working group leading up to the CD3 review. | # Agree on a set of milestones to be achieved by our working group leading up to the CD3 review. | ||
+ | # Summary of my discussions with YERPHI colleague Hrachya Hakopian regarding participation in Gluex and a visit to the USA. | ||
# Review engineering manpower needed within the group in order to achieve the CD3 designs in a timely fashion. | # Review engineering manpower needed within the group in order to achieve the CD3 designs in a timely fashion. | ||
# Yang's status report on analysis of CHESS data | # Yang's status report on analysis of CHESS data |
Revision as of 10:52, 17 January 2008
- Time: 10:00 EST
- Place: EVO and ESNET
- Present:
Contents
Agenda
- Agree on a set of milestones to be achieved by our working group leading up to the CD3 review.
- Summary of my discussions with YERPHI colleague Hrachya Hakopian regarding participation in Gluex and a visit to the USA.
- Review engineering manpower needed within the group in order to achieve the CD3 designs in a timely fashion.
- Yang's status report on analysis of CHESS data
- Answer a query from Ken Finkelstein regarding our readiness to present results from our CHESS measurements at the CHESS user's meeting in June.
- Discuss a suggestion from Ken Finkelstein regarding loan of a diamond to a CHESS colleague who is developing high-resolution crystal topography.
- Discuss a strategy for buying some diamonds from Element Six and putting together some specifications for a thinning job.
- Agree on a set of specifications for the tagger hodoscopes for Elton's spec document.
- Develop a set of specifications for the beamline instrumentation, ditto.
- Review my (upcoming) electron beam requirements document prior to our meeting with Jlab 12 GeV project staff around the end of the month.