Difference between revisions of "BLTWG Meeting 08/20/2012"

From GlueXWiki
Jump to: navigation, search
(Notes)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 570 7748)  
 
* Place: ESNET and EVO (with telephone bridge id 570 7748)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Franz K., Hovanes E., Yi Q., Richard J., James M., Fridah M., Eugene C., Tim W., Igor S., and Curtis M.
 
----
 
----
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
 +
# Report from CUA -- ''Franz''
 +
# Voltage control for bias supply to microscope -- ''Hovanes''
 
# Update on microscope construction -- ''Richard''
 
# Update on microscope construction -- ''Richard''
 
#* possible loan of DAq system with FADC to UConn (in transit)
 
#* possible loan of DAq system with FADC to UConn (in transit)
 
#* two 50 micron SIPM's from Jlab (received)
 
#* two 50 micron SIPM's from Jlab (received)
 
# Report from Sascha regarding activities at Jlab -- ''see below''
 
# Report from Sascha regarding activities at Jlab -- ''see below''
 +
----
  
 
=== Notes ===
 
=== Notes ===

Latest revision as of 11:48, 20 August 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 570 7748)
  • Connecting: instructions are here
  • Present: Franz K., Hovanes E., Yi Q., Richard J., James M., Fridah M., Eugene C., Tim W., Igor S., and Curtis M.

Agenda

  1. Announcements
  2. Report from CUA -- Franz
  3. Voltage control for bias supply to microscope -- Hovanes
  4. Update on microscope construction -- Richard
    • possible loan of DAq system with FADC to UConn (in transit)
    • two 50 micron SIPM's from Jlab (received)
  5. Report from Sascha regarding activities at Jlab -- see below

Notes

Hello Richard,

I will not be able to attend our next beamline meeting. I am on vacations in Moscow now.

Here is a short update:

  • I've sent an SOW draft to Franz and Dan about a week ago. Almost all other docs for the contract are in place.
  • I am preparing a collaboration MOU with ASU now. The draft is almost ready
  • Ivan from MEPhI is back to JLab. We are trying to finalize the technical layout of the PS. I will order scint. tiles and WLS fibers shortly.
  • Hamamatsu said that they would be able to send a first article of SiPMs (~200 pcs) to us in the beginning of November.