Difference between revisions of "BLTWG Meeting 06/29/2009"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 2: Line 2:
 
* Place: EVO and ESNET (with telephone bridge)
 
* Place: EVO and ESNET (with telephone bridge)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: R. Jones, Alex S., P. Androzewicz, E. Minges, and T. Whitlatch.
+
* Present: R. Jones, Alex S., P. Androzewicz, E. Minges, E. Chudakov, and T. Whitlatch.
  
  

Revision as of 12:02, 29 June 2009

  • Time: 11:00 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: R. Jones, Alex S., P. Androzewicz, E. Minges, E. Chudakov, and T. Whitlatch.


Agenda

  1. Preparation for the internal tagger review - Tim
  2. Meeting with BNL diamond working group - Richard
  3. Microscope prototype progress report from UConn - Richard
  4. Plans for pair spectrometer magnet work - Erik
  5. Simulations update + cave backgrounds - Sasha
  6. Funding needs for diamond work + other - discussion
  7. Discussion of ideas for MRI proposal - discussion
  8. Tasks to complete before Lehmann Review - discussion
  9. Progress on MOU's - discussion

Notes

  1. The following plans were presented by the University of North Carolina (UNCW) group led by L. Gan:
    1. collaborate with BNL to bring a 30D72 magnet on loan from BNL to Jlab.
    2. coordinate an engineering effort to modify the gap size of the magnet in order to fit the experimental configuration.
    3. conduct Monte Carlo simulation for the Pair Spectrometer detector design.
    4. develop and construct Pair Spectrometer detectors.
    5. participate in the Pair Spectrometer detector testing, installation, commissioning, calibration and maintenance.