Difference between revisions of "BLTWG Meeting 06/25/2012"
From GlueXWiki
(→Notes) |
|||
Line 18: | Line 18: | ||
===Notes=== | ===Notes=== | ||
+ | |||
+ | * Latest news from SINMAT: | ||
+ | <blockquote> | ||
+ | We have solved the problems etching now. We are trying to thing down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week time. | ||
+ | </blockquote> |
Revision as of 11:06, 25 June 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 549 9207)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Report from Glasgow group -- Ken
- Report from CUA group -- Franz, Alex
- Report from ASU group -- Mike
- Progress on UConn construction contract -- Alex
- June 8 -- Issue solicitation
- June 23 -- Receive proposals
- Update on diamond radiator fabrication -- Brendan
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon?)
Notes
- Latest news from SINMAT:
We have solved the problems etching now. We are trying to thing down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week time.