Difference between revisions of "BLTWG Meeting 04/19/2010"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 7: Line 7:
 
# <i>postponed</i> -- Instrumentation options for the pair spectrometer -- ''Liping''
 
# <i>postponed</i> -- Instrumentation options for the pair spectrometer -- ''Liping''
 
# Status of final design specifications for the tagger -- ''Tim''
 
# Status of final design specifications for the tagger -- ''Tim''
# Creating magnetic field tables from ANSYS -- ''Alex''
+
# [http://www.jlab.org/~somov/magnet_check.txt Creating magnetic field tables from ANSYS] -- ''Alex''
 
# Progress on diamond procurement, laser ablation -- ''Richard''
 
# Progress on diamond procurement, laser ablation -- ''Richard''
 
# Incorporating cable attenuation into tagger rate study -- ''Richard''
 
# Incorporating cable attenuation into tagger rate study -- ''Richard''

Latest revision as of 11:15, 19 April 2010

  • Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge)
  • Connecting: instructions are here
  • Present: Igor S., Alex S., James M, Richard J., Tim W., and Yi

Agenda

  1. postponed -- Instrumentation options for the pair spectrometer -- Liping
  2. Status of final design specifications for the tagger -- Tim
  3. Creating magnetic field tables from ANSYS -- Alex
  4. Progress on diamond procurement, laser ablation -- Richard
  5. Incorporating cable attenuation into tagger rate study -- Richard
  6. Beam test planning -- Igor

Notes