Difference between revisions of "BLTWG Meeting 03/19/2012"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(3 intermediate revisions by 3 users not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 495 6787)  
 
* Place: ESNET and EVO (with telephone bridge id 495 6787)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:
+
* Present: Igor S., Richard J., Alex S., Tim W., Yi Q., Curtis M., Mike D.
 
----
 
----
 
===Agenda===
 
===Agenda===
Line 12: Line 12:
 
#* UConn diamonds
 
#* UConn diamonds
 
#* UConn electronics
 
#* UConn electronics
#* UConn microscope
+
#* UConn microscope: [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Heat-Treating-Fibers.pptx construction info] - Jim McIntyre
 
#* ASU polarimeter
 
#* ASU polarimeter
 
#* UNCW/JLab pair counters
 
#* UNCW/JLab pair counters
 
#* JLab pair spectrometer, converter
 
#* JLab pair spectrometer, converter
# Calibration and alignment wiki page
+
# [https://halldweb.jlab.org/wiki/index.php/Alignment_and_Calibration  Calibration and alignment wiki page]
 
----
 
----
  
 
===Notes===
 
===Notes===

Latest revision as of 10:25, 31 March 2015

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 495 6787)
  • Connecting: instructions are here
  • Present: Igor S., Richard J., Alex S., Tim W., Yi Q., Curtis M., Mike D.

Agenda

  1. Announcements
  2. UConn construction contract - Alex
  3. Reports from working groups
    • CUA hodoscope
    • Glasgow goniometer + ladder
    • UConn diamonds
    • UConn electronics
    • UConn microscope: construction info - Jim McIntyre
    • ASU polarimeter
    • UNCW/JLab pair counters
    • JLab pair spectrometer, converter
  4. Calibration and alignment wiki page

Notes