Difference between revisions of "BLTWG Meeting 03/19/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 495 6787)  
 
* Place: ESNET and EVO (with telephone bridge id 495 6787)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:
+
* Present: Igor S., Richard J., Alex S., Tim W., Yi Q., Curtis M., Mike D.
 
----
 
----
 
===Agenda===
 
===Agenda===

Revision as of 11:37, 19 March 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 495 6787)
  • Connecting: instructions are here
  • Present: Igor S., Richard J., Alex S., Tim W., Yi Q., Curtis M., Mike D.

Agenda

  1. Announcements
  2. UConn construction contract - Alex
  3. Reports from working groups
    • CUA hodoscope
    • Glasgow goniometer + ladder
    • UConn diamonds
    • UConn electronics
    • UConn microscope
    • ASU polarimeter
    • UNCW/JLab pair counters
    • JLab pair spectrometer, converter
  4. Calibration and alignment wiki page

Notes