Difference between revisions of "BLTWG Meeting 03/19/2012"
From GlueXWiki
(→Agenda) |
|||
Line 16: | Line 16: | ||
#* UNCW/JLab pair counters | #* UNCW/JLab pair counters | ||
#* JLab pair spectrometer, converter | #* JLab pair spectrometer, converter | ||
− | # Calibration and alignment wiki page | + | # [https://halldweb1.jlab.org/wiki/index.php/Alignment_and_Calibration Calibration and alignment wiki page] |
---- | ---- | ||
===Notes=== | ===Notes=== |
Revision as of 11:25, 19 March 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 495 6787)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- UConn construction contract - Alex
- Reports from working groups
- CUA hodoscope
- Glasgow goniometer + ladder
- UConn diamonds
- UConn electronics
- UConn microscope
- ASU polarimeter
- UNCW/JLab pair counters
- JLab pair spectrometer, converter
- Calibration and alignment wiki page