Difference between revisions of "BLTWG Meeting 03/07/2011"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
# [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-2-2011/Beamtest-2-2011.pptx Parasitic beam time request goals] -- ''Richard''
 
# [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-2-2011/Beamtest-2-2011.pptx Parasitic beam time request goals] -- ''Richard''
 
# Preparations for beam tests -- ''discussion''
 
# Preparations for beam tests -- ''discussion''
# Pair Spectrometer magnet simulation
+
# [[Pair Spectrometer Magnet Simulation]]

Revision as of 09:32, 7 March 2011

Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 296 3277)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Parasitic beam time request goals -- Richard
  2. Preparations for beam tests -- discussion
  3. Pair Spectrometer Magnet Simulation