Difference between revisions of "BLTWG Meeting 02/28/2011"
From GlueXWiki
Line 1: | Line 1: | ||
− | Time: | + | Time: 14:00 EST |
* Place: ESNET and EVO (with telephone bridge id 296 3277) | * Place: ESNET and EVO (with telephone bridge id 296 3277) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
Line 7: | Line 7: | ||
# Design of the vacuum chamber | # Design of the vacuum chamber | ||
+ | #* Downstream end of the vaccum chamber | ||
+ | #* Distance between the focal plane and VC exit window | ||
# Fixed-array and microscope counter support structure | # Fixed-array and microscope counter support structure | ||
− | ## | + | #* Position of the microscope counters |
+ | #* Microscope cnt fiber length |
Revision as of 14:46, 28 February 2011
Time: 14:00 EST
- Place: ESNET and EVO (with telephone bridge id 296 3277)
- Connecting: instructions are here
- Present:
Agenda
- Design of the vacuum chamber
- Downstream end of the vaccum chamber
- Distance between the focal plane and VC exit window
- Fixed-array and microscope counter support structure
- Position of the microscope counters
- Microscope cnt fiber length