Difference between revisions of "BLTWG Meeting 01/24/2011"

From GlueXWiki
Jump to: navigation, search
 
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
* Time: 11:00 EST
 
* Time: 11:00 EST
* Place: ESNET and EVO (with telephone bridge id ??)  
+
* Place: ESNET and EVO (with telephone bridge id 2836265)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., Igor S., Hannah W., Tim W., Yi Q., Alex S, and Franz K.
  
 
===Agenda===
 
===Agenda===
  
# Talks schedule for collaboration meeting -- ''Richard''
+
# [http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX-Collaboration-Jan-2011#AGENDA Talks schedule for collaboration meeting] -- ''Richard''
 
# [[Polarimeter_01_10_2011 | Progress on direct polarimetry in the Hall D beamline]] -- ''Hovanes''
 
# [[Polarimeter_01_10_2011 | Progress on direct polarimetry in the Hall D beamline]] -- ''Hovanes''
 
# Further discussion of dark rate sensitivity in SiPM readout for the microscope [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/rates-10-2009/rates.pdf] -- ''Richard''
 
# Further discussion of dark rate sensitivity in SiPM readout for the microscope [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/rates-10-2009/rates.pdf] -- ''Richard''
 
# Progress on diamond thinning by Sinmat -- ''Richard''
 
# Progress on diamond thinning by Sinmat -- ''Richard''
 
# Scheduling prototype installation and alignment in Hall B -- ''discussion''
 
# Scheduling prototype installation and alignment in Hall B -- ''discussion''

Latest revision as of 12:11, 24 January 2011

  • Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 2836265)
  • Connecting: instructions are here
  • Present: Richard J., Igor S., Hannah W., Tim W., Yi Q., Alex S, and Franz K.

Agenda

  1. Talks schedule for collaboration meeting -- Richard
  2. Progress on direct polarimetry in the Hall D beamline -- Hovanes
  3. Further discussion of dark rate sensitivity in SiPM readout for the microscope [1] -- Richard
  4. Progress on diamond thinning by Sinmat -- Richard
  5. Scheduling prototype installation and alignment in Hall B -- discussion