Difference between revisions of "BLTWG Meeting 01/09/2012"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
# Announcements
 
# Announcements
 
# [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Hall%20D%202012%20Change%20Request.xls Changes] to the [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Tagger-beamline_baseline_sep2011.pdf Beamline Construction Schedule] - ''Tim''
 
# [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Hall%20D%202012%20Change%20Request.xls Changes] to the [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Tagger-beamline_baseline_sep2011.pdf Beamline Construction Schedule] - ''Tim''
# [[Media:SOW_UConn_ver1.docx | Discussion of the UConn SOW]] - ''Sascha, all''
+
# [http://argus.phys.uregina.ca/gluex/DocDB/0018/001884/001/HallD_SOW_UConn_Construction_v01.docx Discussion of the UConn SOW ] - ''Sascha, all''
 
# [http://zeus.phys.uconn.edu/halld/polarimetry/polarimeter-1-9-2012.pdf ASU polarimeter report] - ''Mike''
 
# [http://zeus.phys.uconn.edu/halld/polarimetry/polarimeter-1-9-2012.pdf ASU polarimeter report] - ''Mike''
  
 
===Notes===
 
===Notes===

Revision as of 17:57, 9 January 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 453 6668)
  • Connecting: instructions are here
  • Present: Igor S., Richard J., Alex S., Hovanes E., Ivan T., Franz K., Yi Q., Tim W., and Curtis M.

Agenda

  1. Announcements
  2. Changes to the Beamline Construction Schedule - Tim
  3. Discussion of the UConn SOW - Sascha, all
  4. ASU polarimeter report - Mike

Notes