Difference between revisions of "BLTWG Meeting 01/09/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 8: Line 8:
 
# [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Hall%20D%202012%20Change%20Request.xls Changes] to the [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Tagger-beamline_baseline_sep2011.pdf Beamline Construction Schedule] - ''Tim''
 
# [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Hall%20D%202012%20Change%20Request.xls Changes] to the [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Tagger-beamline_baseline_sep2011.pdf Beamline Construction Schedule] - ''Tim''
 
# [[Media:SOW_UConn_ver1.docx | Discussion of the UConn SOW]] - ''Sascha, all''
 
# [[Media:SOW_UConn_ver1.docx | Discussion of the UConn SOW]] - ''Sascha, all''
 +
# [http://zeus.phys.uconn.edu/halld/polarimetry/polarimeter-1-9-2012.pdf ASU polarimeter report] - ''Mike''
  
 
===Notes===
 
===Notes===

Revision as of 12:38, 9 January 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 453 6668)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Changes to the Beamline Construction Schedule - Tim
  3. Discussion of the UConn SOW - Sascha, all
  4. ASU polarimeter report - Mike

Notes