August 9, 2018 DIRC
From GlueXWiki
Meeting Information
GlueX DIRC Analysis Meeting
Thursday August 9, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- New meeting time for Fall semester: Doodle poll
- Optical box
- Fabrication status update (Ernie and Jason)
- Component QA and assembly status at Bates
- Window flange modification
- Assembly sequence and testing plans at Bates
- Dark box design (Jason)
- PMT test fixture and cookies (Maria)
- Fabrication status update (Ernie and Jason)
- Installation schedule discussion:
- Requirements for mechanical install of optical box: Aug 10 installation schedule
- Ernie to deliver on Sunday evening, August 12
- Packing list from Bates (Jason)
- Goals (reduce risk for final installation):
- Test water tightness of optical box and interface with bar boxes
- Flow water through full system and establish controls, N2 purge, etc.
- Requirements for mechanical install of optical box: Aug 10 installation schedule
- Mirror box laser alignment
- Update on geometry and laser projections (Bill)
- Cabling and DAQ integration
- Cabling progress (Tim, Fernando)
- Installation of VXS crate and SSP modules complete, initial integration into DAQ underway by Sasha and Sergei.
- Simulation studies (Maria and Roman)
- Finalizing DIRC "as-build" geometry: support frames, etc. (Yunjie, Maria)
- Documentation of LUT algorithm by Maria
- Implementation of reconstruction in PID library underway (Justin)
- MAPMT testing (Bill and Andrew)
- Magnetic field tests underway
- Update on ADC fitting procedure
- Commissioning plans
- Reminder: Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed by August 20 (close of Hall D for beam)